AEP Ohio is committed to improving reliability in North Columbus. Through inspections and new installations, our crews have taken many steps to ensure fewer power outages and faster restoration times when they do happen. Watch the video below and read on to learn more.
By the Numbers

This year alone in North Columbus, our crews have:
- Inspected more than 40 miles of electric lines.
- Put up close to 30 new electric poles.
- Installed over 100 new pieces of electrical equipment like:
- Cutouts, which disconnect faulty or overloaded lines to protect other equipment.
- Reclosers, which can restore power after temporary interruption.
- Crossarms, which help support wires on poles.
- Continued forestry work to trim and remove trees that are at risk of causing outages.
Continuing Efforts
These improvements are in addition to our ongoing work to boost reliability. Whether through drones to streamline our power line inspections or our preparation for storms, we’re moving toward a more reliable energy future.